Torrent Power acquires 50MW solar power plant in Maharashtra

TAGS

Torrent Power has closed the previously announced INR 300 crore acquisition of LREHL Renewables India SPV 1 Private Limited, a special purpose vehicle (SPV) which operates a 50MW solar power plant in Maharashtra.

The SPV was acquired from Lightsource bp and UK Climate Investments (UKCI) as per a deal signed in July 2021.

Torrent Power acquires 50MW solar power plant in Maharashtra

Torrent Power acquires 50MW solar power plant in Maharashtra. Photo courtesy of andreas160578 from Pixabay.

The acquired solar power plant has been in operation since April 2018. It is underpinned by a 25-year power purchase agreement (PPA) with Solar Energy Corporation of India (SECI) for its full capacity at a tariff of INR 4.43/ kWh.

See also  Delhi on the edge again: Rising Yamuna River and rain bring threat of floods to doorstep

Following the acquisition of the 50MW solar power plant in Maharashtra, the total generation capacity of Torrent Power, including an under development portfolio, will be 4.6GW with renewable portfolio of more than 1.5GW.

CATEGORIES
TAGS
Share This