Santo Agostinho wind farm : Siemens Gamesa wins turbine contract from Engie
Siemens Gamesa, in mid-January 2021, secured a turbine supply contract from Engie for 434MW Santo Agostinho wind farm in Brazil. The wind farm to be built in north-east Rio Grande do Norte will be equipped with 70 SG 5.8-170 turbines, that are integrated with OptimaFlex technology to operate at 6.2MW. According to Siemens Gamesa, the […]