Smørbukk Nord project : TechnipFMC wins iEPCI contract from Equinor

TAGS

TechnipFMC has won an integrated Engineering, Procurement, Construction and Installation (iEPCI) contract from Equinor for its project in the Norwegian Sea.

Under the terms of the contract, TechnipFMC will be responsible for delivering and installing a high-pressure, high-temperature subsea production system and associated equipment needed for the brownfield tieback of the Smørbukk Nord discovery to the in the .

See also  TechnipFMC wins iEPCI contract for Energean’s Mediterranean Katlan project

The contract follows the front end engineering and design (FEED) work won by TechnipFMC for the Smørbukk Nord project in 2021.

TechnipFMC wins iEPCI contract from Equinor for the Smørbukk Nord project

TechnipFMC wins iEPCI contract from Equinor for the Smørbukk Nord project. Image courtesy of TechnipFMC plc.

— TechnipFMC Subsea President, commenting on the contract for the Smørbukk Nord project, said: “Our ability to deliver this optimized solution for Equinor is possible due to our close collaboration with the client, portfolio of subsea equipment, and integrated execution model. We’re delighted to be once again delivering an iEPCI project for Equinor.”

See also  Johnson Matthey to sell part of battery materials business to EV Metals

TechnipFMC said that the installation campaign for the Smørbukk Nord project will use its battery hybrid vessel, which will decrease greenhouse gas emissions via lesser fuel consumption.

CATEGORIES
TAGS
Share This