Inox Wind bags order for 200MW Dayapar wind farm from NTPC
Inox Wind has won a turnkey order for the 200MW Dayapar wind farm in Gujarat from NTPC Renewable Energy Limited, a fully-owned subsidiary of NTPC.
Located in the Kutch district, the wind farm in Dayapur is slated to begin operations by January 2024.
Kailash Tarachandani — Inox Wind CEO said: “We are excited to bag this prestigious 200 MW project from NTPC; the largest order awarded by a PSU in the recent past. This is the second project awarded by NTPC to INOX Wind in the recent past, post a 150 MW order received last year.
“This reflects their immense faith in our capabilities and credentials. A few years ago, INOX Wind had also successfully executed a 50 MW turnkey wind project for NTPC in Gujarat. We hope to foster a long- term relationship with NTPC and become their trusted supplier and an enabler in achieving their ambitious renewable energy target.”
As part of the contract, Inox Wind will supply and install DF 113/92 – 2.0 MW capacity wind turbines. The wind turbines for the Dayapar wind farm will have a rotor diameter of 113m and a hub height of 92m.
Inox Wind will also be responsible for the operation and maintenance (O & M) of the wind project in Kutch district.
Discover more from Business-News-Today.com
Subscribe to get the latest posts sent to your email.