Dilip Buildcon Limited said that it has been declared as the L-1 bidder for a contract worth INR 702.02 crores pertaining to the Surat metro rail project phase-1 (Pkg.CS.6) in Gujarat.
The tender was floated by the Gujarat Metro Rail Corporation (GMRC) Limited. It is for the construction of an elevated viaduct with a length of 8.7kms and seven stations from Majura Gate to Saroli Dead End under Saroli Dead End.
According to Dilip Buildcon, the completion period of the Surat metro rail project phase-1 (Pkg.CS.6) is 26 months.
Discover more from Business-News-Today.com
Subscribe to get the latest posts sent to your email.